Search results for: IEA Library Listings

Bioenergy News, Volume 18 #2, December 2006

IEA Bioenergy News is the newsletter of IEA Bioenergy. This issue covers the October ExCo58 meeting in Stockholm, Sweden. It also features the ExCo58 workshop, an editorial on Bioenergy in Sweden, the new Technical Coordinator role, the new Task on biorefineries and recent publications and upcoming events….

Date: 1 Dec 2006

The status of large scale biomass firing

…This IEA Bioenergy Task 32 report provides an overview of the current status of biomass cofiring. The report shows that the firing and co-firing of biomass as a replacement for coal in large pulverised coal boilers can be a very attractive option for the utilisation of biomass materials for power production, and for the delivery of renewable energy.   The full report can be downloaded IEA_Bioenergy_T32_cofiring_2016…

Date: 2 Mar 2016

ExCo72 – Electricity from Biomass: from small to large scale – Summary and Conclusions

…ts and various stakeholders and thereby enhance the policy-oriented work within IEA Bioenergy….

Date: 9 Apr 2015

New Publication: Drop-in biofuels: The key role that co-processing will play in its production

…edstocks/intermediates such as lipids, oleochemicals, bio-oils and biocrudes to finished, lower CI drop-in biofuels. Complete report: Task-39-Drop-in-Biofuels-Full-Report-January-2019 Executive summary: http://task39.sites.olt.ubc.ca/files/2019/02/IEA-Bioenergy-Task-39-Drop-in-Update-Executive-Summary-February-2019.pdf Open-access article in the Journal BioFPR: ‘Potential synergies of drop-in biofuel production with further co-processing at oil re…

Date: 30 Sep 2019

Flexible Bioenergy and System Integration

…arbon energy systems, – WP2 – Acceleration of implementation, – WP3 – System requirements for bioenergy concepts, – WP4 – Inter-Task projects and collaborative projects (iii) Information exchange with other IEA IA’s, other IEA Bioenergy Tasks and other international networks worldwide; (iv) ExCo interaction and support. Triennium Report Download the Task 44 – End-of-Triennium report 2019-2021…

Date: 5 Feb 2019